Two-Level Highway

Title of The Project: Development of Two-Level Highway along the bank of Karnafully river from Sadarghat to Kalurghat of Chittagong City.

Estimated Cost: TK. 580 crore(approx.) (US $ 100 million)

Brief Description: Development of Two-Level Highway along the bank of Karnafully river (from Sadarghat to Kalurghat) having different levels for light and heavy vehicles. The lower level road immediately above the tide level at the river side will be used for light vehicles movement and upper level road for heavy vehicle movement at the same time. Moreover, the lower level road will be used to serve the purpose of river side recreational activities along with boating and angling facilities for the city dwellers.

Length: 12 km. (approx.)
Width: 200 ft.
Cost/km: TK. 48 crore(approx.)